by tagdesignco | Sep 21, 2017
UBC Okanagan 25 Year Campus Master Plan for Medium Temperature District Hot Water Heating The approved UBC Okanagan 2015 Campus Master Plan indicated a requirement to extend medium temperature district energy system (MDES) hot water to 231,976m2 (2,496,969ft2) of...
by tagdesignco | May 31, 2023
UBC Okanagan MDES District Building on an earlier 25-year Master Planning phase completed by CURA, UBC Okanagan engaged CURA for Mechanical Engineering support for the 2017/2018 installation of 440m of twinned supply and return underground pre-insulated 250mm dia....
by tagdesignco | May 31, 2023
UBC Okanagan CHP/MDES/LDES Interconnect CURA was engaged by UBC Okanagan to complete the interconnection of the Central Heat Plant to an existing dormant 440m twinned supply and return underground heating pipeline that had been installed in 2017/2018. We provided a...
by tagdesignco | May 31, 2023
UBC Okanagan Science Building 3rd Floor & Heat Pump Interconnect An existing 280ton district energy groundwater to water heat pump that served the lower two floors of this three-storey 100,000 ft2 building was underutilized and had spare capacity to serve the top...
by tagdesignco | May 31, 2023
UBC Okanagan Data Centre Cooling The existing Library Data Centre’s air-cooled split DX (direct expansion) cooling systems had begun to fail after approximately 7 years of operation. The customer required a new cooling system for the data centre with a lower...