by tagdesignco | Jun 13, 2023
UBC Okanagan Science Building Laboratory Exhaust Heat Recovery During a 2020-2022 major HVAC system upgrade to the Science Building, CURA was contracted by UBC Okanagan to review the building automation system during the post-construction monitoring period, and CURA...
by tagdesignco | Sep 21, 2017
UBC Okanagan Science Building Heat Recovery The 100,000ft2 Science Facility at the University of British Columbia Okanagan Campus is a general chemistry teaching and research facility and the building suffered from high heating energy costs due to the approximately...
by tagdesignco | May 31, 2023
UBC Okanagan CHP/MDES/LDES Interconnect CURA was engaged by UBC Okanagan to complete the interconnection of the Central Heat Plant to an existing dormant 440m twinned supply and return underground heating pipeline that had been installed in 2017/2018. We provided a...
by tagdesignco | May 31, 2023
UBC Okanagan Science Building 3rd Floor & Heat Pump Interconnect An existing 280ton district energy groundwater to water heat pump that served the lower two floors of this three-storey 100,000 ft2 building was underutilized and had spare capacity to serve the top...