by tagdesignco | May 31, 2023
BC Tree Fruits Oliver Dry Tunnel CURA designed the HVAC, drying system, exhaust ventilation system and fire protection for this specialized dry tunnel for fruit processing. A specialized ventilation solution was designed to ensure that the fruit was dried but not...
by tagdesignco | Jun 1, 2023
UBC Okanagan Administration Building Fire System Upgrade CURA acted as the Prime and Mechanical Consultant for a complete fire protection system code and condition assessment for this 60,000ft2 institutional building in Kelowna BC. The first phases of the project...
by tagdesignco | Jun 1, 2023
City of Prince George New Fire Hall No. 1 CURA provided detailed Fire Protection Engineering services, shop drawings and hydraulic calculations for this new fire hall on three levels of approximately 30,000ft2 in Prince George, BC. Unique features of the fire...
by tagdesignco | Jun 1, 2023
LaFarge Holcim Geocycle Fuel Storage Barn Dust Hazard Audit CURA provided a preliminary dust hazard audit for the fuel storage barn located at the LaFarge Holcim portland cement manufacturing facility in Richmond BC. The Geocycle drying oven at the facility can use a...
by tagdesignco | Jun 1, 2023
College of New Caledonia – Welding Instruction Building Fire Protection CURA provided the detailed fire protection system design, fire hydrant flow demand testing services, and hydraulic calculations for this new 32,000ft2 welding instructional facility in Vanderhoof,...