by tagdesignco | Jun 1, 2023
Tolko Industries High Level – Continuous Dry Kiln Fire Protection Engineering Review CURA provided engineering review services to the installing contractor for this large thermal-oil heated continuous dry kiln (CDK) in High Level Alberta. The kiln is a two-level...
by tagdesignco | Jun 1, 2023
Kelowna Yacht Club – Marina Docks Fire Protection CURA provided a complete code analysis and preliminary design for a replacement fire protection system for the existing failed dockside standpipe fire protection system at the Kelowna Yacht Club. Please contact us for...
by tagdesignco | Jun 1, 2023
Medallion Kitchen Cabinets Dust System Evaluation CURA conducted a preliminary dust hazard audit and NFPA/BC Building Code conformance audit on this large cabinet manufacturing facility in Penticton, BC. File Number: 1420-0124.00 Location: Penticton, BC Sector: ...
by tagdesignco | Jun 1, 2023
Aboriginal Housing Society of Prince George CURA provided the fire protection system design for this 50 unit / 5 building housing project in Prince George. Please contact us for any fire protection engineering assignments. File Number: 1420-0132.00 Location: Prince...
by tagdesignco | Jun 1, 2023
International Forest Products (Interfor) – Adams Lake Division – New Continuous Dry Kiln (CDK) Fire Protection CURA provided a complete fire protection design package for this new 188’x35’ thermal-oil heated continuous dry kiln that was installed at the Adams Lake...