by tagdesignco | Apr 28, 2023
UBC Okanagan Campus Skeena & Commons Buildings District Energy Servicing Study A study examining the technical feasibility and costs of connecting two proposed new facilities totaling 203,000ft2 of occupied area to campus district energy facilities was performed,...
by tagdesignco | May 16, 2023
Campion Marine Combustible Dust Engineering & Gelcoat Spray Booth Consulting CURA provided Campion Marine with engineering assistance to aid this powerboat manufacturing company to comply with safety audit items identified by WorkSafeBC during routine audits. ...
by tagdesignco | Sep 21, 2017
UBC Okanagan Science Building Heat Recovery The 100,000ft2 Science Facility at the University of British Columbia Okanagan Campus is a general chemistry teaching and research facility and the building suffered from high heating energy costs due to the approximately...
by tagdesignco | Sep 21, 2017
UBC Okanagan 25 Year Campus Master Plan for Medium Temperature District Hot Water Heating The approved UBC Okanagan 2015 Campus Master Plan indicated a requirement to extend medium temperature district energy system (MDES) hot water to 231,976m2 (2,496,969ft2) of...
by tagdesignco | May 31, 2023
UBC Okanagan MDES District Building on an earlier 25-year Master Planning phase completed by CURA, UBC Okanagan engaged CURA for Mechanical Engineering support for the 2017/2018 installation of 440m of twinned supply and return underground pre-insulated 250mm dia....