by tagdesignco | May 31, 2023
UBC Okanagan CHP/MDES/LDES Interconnect CURA was engaged by UBC Okanagan to complete the interconnection of the Central Heat Plant to an existing dormant 440m twinned supply and return underground heating pipeline that had been installed in 2017/2018. We provided a...
by tagdesignco | May 31, 2023
UBC Okanagan Science Building 3rd Floor & Heat Pump Interconnect An existing 280ton district energy groundwater to water heat pump that served the lower two floors of this three-storey 100,000 ft2 building was underutilized and had spare capacity to serve the top...
by tagdesignco | May 31, 2023
Medical Cannabis Grow Facility CURA provided preliminary design services to the Owner’s group and project Architects for this two-story 90,000ft2 medicinal cannabis grow facility, as well as conducted an analysis of cooling and dehumidification loads for the bare root...
by tagdesignco | May 31, 2023
Big White Resort – Sewage Treatment Building – Area and Electrical Classification CURA completed an Area Classification, Ventilation and Electrical Classification for the planned effluent treatment building for the Big White Ski Resort near Kelowna BC. Please contact...
by tagdesignco | May 31, 2023
UBC Okanagan Data Centre Cooling The existing Library Data Centre’s air-cooled split DX (direct expansion) cooling systems had begun to fail after approximately 7 years of operation. The customer required a new cooling system for the data centre with a lower...