by tagdesignco | May 31, 2023
BID Group Spray Building Lease Evaluation CURA performed a building condition assessment for the BID Group and a complete code analysis of this existing heavy-duty maintenance facility, to determine its suitability for conversion to a finishing and paint spray...
by tagdesignco | May 31, 2023
University Hospital of Northern BC – 1 MW Generator Replacement – Owner’s Agent CURA provided Owner’s Agent 3rd party verification of this project that was delivered in a design-build format. Our role included a design check of the HVAC, heat rejection, fuel oil...
by tagdesignco | May 31, 2023
BC Tree Fruits Growers Supply Warehouse Ventilation Assessment CURA provided a complete assessment of ventilation and fire protection requirements for this existing warehouse that is used to store pesticides, herbicides, acids, strong bases, fertilizer and other...
by tagdesignco | May 31, 2023
BC Tree Fruits Oliver Dry Tunnel CURA designed the HVAC, drying system, exhaust ventilation system and fire protection for this specialized dry tunnel for fruit processing. A specialized ventilation solution was designed to ensure that the fruit was dried but not...
by tagdesignco | May 31, 2023
BC Tree Fruits Oliver Ventilation and Cooling Study CURA performed a feasibility study on this 102,000ft2 fruit processing and packing facility to determine code, ventilation and cooling requirements for all process spaces including washing, packaging/packing, the...