by tagdesignco | Jun 1, 2023
Interfor Grand Forks CURA acted as the Prime Consultant, and as the Mechanical/Site Civil/Fire Protection/Plumbing Consultant, and we provided a fully integrated design team of Mechanical, Architectural, Structural, Geotechnical & Electrical consulting services to...
by tagdesignco | Jun 1, 2023
UBC Science Building – 2020-2022 HVAC Systems Upgrades The Facilities Management group at UBC Okanagan required assistance with determining the root cause and solutions for deficient winter heating system capacity in the 1st and 2nd floors of this existing 100,000ft2...
by tagdesignco | Jun 1, 2023
Roxul High-Piled Storage Racking Fire Protection System CURA provided detailed fire protection engineering, shop drawings and hydraulic calculations for the design of a wet fire sprinkler system that serves a specialized high-piled commodities storage racking system...
by tagdesignco | May 16, 2023
Campion Marine Combustible Dust Engineering & Gelcoat Spray Booth Consulting CURA provided Campion Marine with engineering assistance to aid this powerboat manufacturing company to comply with safety audit items identified by WorkSafeBC during routine audits. ...
by tagdesignco | May 31, 2023
Tolko Industries – Lavington Planer – Fire Protection for New Continuous Dry Kiln During the planning stages for a new Continuous Dry Kiln system for the Lavington Planer site, Tolko Industries required CURA’s assistance to ensure that the site’s fire protection water...