UBC Science Building – 2020-2022 HVAC Systems Upgrades

The Facilities Management group at UBC Okanagan required assistance with determining the root cause and solutions for deficient winter heating system capacity in the 1st and 2nd floors of this existing 100,000ft2 Science and research facility.  Many of the heating capacity issues dated back to the original design and construction of the facility in 1991; and solutions were determined through an extensive forensic and data-driven engineering process including:

  • A complete review of existing HVAC drawings including multiple renovations and modifications
  • Automation system reports & drawings
  • Detailed site tours & investigations that included review of Mechanical Rooms, all hydronic heating piping from origin to endpoint, and auditing of select ceiling space areas.

Engineered solutions were developed to remedy the facility’s HVAC deficiencies and an extensive phased Mechanical System upgrade of the building was performed over a 16-month construction period, while the occupants of the facility continued their typical activities without interruption.

Variable flow heating water systems were refitted to the facility, all heat transfer equipment for the lower two floors was refitted to low temperature type, controls algorithms were reworked to prevent unnecessary discharge of return air to outdoors, and an extensive reprogramming and recommissioning of the building automation systems was completed with the goal of saving approximately $30,000/year in natural gas heating costs.

This low-temperature heating system retrofit allowed UBC Okanagan to utilize an existing water to water heat pump to its full potential, providing both natural gas cost savings, and carbon emissions reduction benefits.

Supply air ventilation fans were replaced due to imminent failure, and all main heat transfer equipment was replaced to ensure that comfort conditions and the correct amount of ventilation are provided throughout the facility.  Automation algorithms were reworked to take better advantage of existing exhaust air energy recovery equipment to realize further energy cost reductions.

All major new HVAC equipment was specified by CURA, pre-ordered and pre-configured in a “plug-and-play” format to ensure that it dimensionally matched the planned installation and could be installed rapidly during brief HVAC system shutdowns.  Bids from key equipment suppliers were sought, to ensure that the major customized HVAC equipment could be procured early to ensure that all key HVAC items were on site and ready for use by the installing contractor.

Supply air fans were customized by CURA to dimensionally match existing inlet bellmouth configuration and floor structural supports, to ensure a rapid replacement & installation.  Key Structural anchor points were designed to ensure that the largest pieces of HVAC equipment could be maneuvered into and out of the basement Mechanical rooms safely.

Airflow measuring equipment was specified and installed in the major air handling systems to ensure that updated HVAC system controls algorithms performed correctly, and to allow the University to gather intelligence and trend data that can be used during further energy reduction projects at the campus.

CURA acted as the Prime and Mechanical Consultant for the project and our integrated design team included Structural, Electrical and Architectural consultants.

File Number: 1420-0117.00

Location: Kelowna, BC

Sector: Institutional, Post-Secondary

Services Provided:

More Projects

TECK Highland Valley Copper Mine – New Pebble Crusher Dust Control System Evaluation

TECK Highland Valley Copper Mine – New Pebble Crusher Dust Control System Evaluation

TECK Highland Valley Copper A/B Line Dust Control System Evaluation

TECK Highland Valley Copper A/B Line Dust Control System Evaluation

Interfor Grand Forks – New Fire Protection System & Fire Pumps

Interfor Grand Forks – New Fire Protection System & Fire Pumps

UBC Science Building – 2020-2022 HVAC Systems Upgrades

UBC Science Building – 2020-2022 HVAC Systems Upgrades

Roxul High-Piled Storage Racking Fire Protection System

Roxul High-Piled Storage Racking Fire Protection System

Shuswap Lake Hospital – Hot Water Heating System Upgrades

Shuswap Lake Hospital – Hot Water Heating System Upgrades

UBC Okanagan Science Building Laboratory Exhaust Heat Recovery

UBC Okanagan Science Building Laboratory Exhaust Heat Recovery

UBC Okanagan Campus Skeena & Commons Buildings District Energy Servicing Study

UBC Okanagan Campus Skeena & Commons Buildings District Energy Servicing Study

Vets Group & FP Innovations Combustible Dust Training Seminars

Vets Group & FP Innovations Combustible Dust Training Seminars

Jim Pattison Outpatient Care & Surgical Centre

Jim Pattison Outpatient Care & Surgical Centre

Campion Marine Combustible Dust Engineering & Gelcoat Spray Booth Consulting

Campion Marine Combustible Dust Engineering & Gelcoat Spray Booth Consulting

UBC Okanagan Science Building Heat Recovery

UBC Okanagan Science Building Heat Recovery

UBC Okanagan 25 Year Campus Master Plan for Medium Temperature District Hot Water Heating

UBC Okanagan 25 Year Campus Master Plan for Medium Temperature District Hot Water Heating

Kind Brewery Steam System

Kind Brewery Steam System

UBC Okanagan MDES District

UBC Okanagan MDES District

UBC Okanagan CHP/MDES/LDES Interconnect

UBC Okanagan CHP/MDES/LDES Interconnect

UBC Okanagan Science Building 3rd Floor & Heat Pump Interconnect

UBC Okanagan Science Building 3rd Floor & Heat Pump Interconnect

TOP40 Woodworks Dust Hazard Audit and Dust System Assessment

TOP40 Woodworks Dust Hazard Audit and Dust System Assessment

Tolko Industries – Lavington Planer – Fire Protection for New Continuous Dry Kiln

Tolko Industries – Lavington Planer – Fire Protection for New Continuous Dry Kiln

Osoyoos Medical Cannabis Grow Facility

Osoyoos Medical Cannabis Grow Facility

Big White Resort – Sewage Treatment Building – Area and Electrical Classification

Big White Resort – Sewage Treatment Building – Area and Electrical Classification

UBC Okanagan Data Centre Cooling

UBC Okanagan Data Centre Cooling

BC Tree Fruits New Cold Warehouse

BC Tree Fruits New Cold Warehouse

BID Group Spray Building Lease Evaluation

BID Group Spray Building Lease Evaluation

University Hospital of Northern BC – 1 MW Generator Replacement – Owner’s Agent

University Hospital of Northern BC – 1 MW Generator Replacement – Owner’s Agent

BC Tree Fruits Growers Supply Warehouse Ventilation Assessment

BC Tree Fruits Growers Supply Warehouse Ventilation Assessment

BC Tree Fruits Oliver Dry Tunnel

BC Tree Fruits Oliver Dry Tunnel

BC Tree Fruits Oliver Ventilation and Cooling Study

BC Tree Fruits Oliver Ventilation and Cooling Study

Tolko Industries Planermill Dust System Optimization

Tolko Industries Planermill Dust System Optimization

Tolko Industries Armstrong Spray Room Ventilation

Tolko Industries Armstrong Spray Room Ventilation

UBC Okanagan Administration Building Fire System Upgrade

UBC Okanagan Administration Building Fire System Upgrade

Bureau Veritas HVAC System Review – Expert Witness

Bureau Veritas HVAC System Review – Expert Witness

Rancho Warehouse & Cooling – Refrigeration Room Ventilation Assessment

Rancho Warehouse & Cooling – Refrigeration Room Ventilation Assessment

City of Prince George New Fire Hall No. 1

City of Prince George New Fire Hall No. 1

Rio Tinto Alcan – Kitimat Operations – Wharf Dust Collection System Replacement – Phase 1

Rio Tinto Alcan – Kitimat Operations – Wharf Dust Collection System Replacement – Phase 1

C&C Wood Products – Dust Hazard Audit and NFPA Audit

C&C Wood Products – Dust Hazard Audit and NFPA Audit

LaFarge Holcim Geocycle Fuel Storage Barn Dust Hazard Audit

LaFarge Holcim Geocycle Fuel Storage Barn Dust Hazard Audit

College of New Caledonia – Welding Instruction Building Fire Protection

College of New Caledonia – Welding Instruction Building Fire Protection

Tolko Industries High Level – Continuous Dry Kiln Fire Protection Engineering Review

Tolko Industries High Level – Continuous Dry Kiln Fire Protection Engineering Review

Kelowna Yacht Club – Marina Docks Fire Protection

Kelowna Yacht Club – Marina Docks Fire Protection

Penticton Regional Hospital – Boiler Rebate Application Support

Penticton Regional Hospital – Boiler Rebate Application Support

Medallion Kitchen Cabinets Dust System Evaluation

Medallion Kitchen Cabinets Dust System Evaluation

Aboriginal Housing Society of Prince George

Aboriginal Housing Society of Prince George

International Forest Products (Interfor) – Adams Lake Division – New Continuous Dry Kiln (CDK) Fire Protection

International Forest Products (Interfor) – Adams Lake Division – New Continuous Dry Kiln (CDK) Fire Protection

Landmark Solutions New Fabrication and Heavy Duty Shop

Landmark Solutions New Fabrication and Heavy Duty Shop

University of British Columbia – Learning Commons Building – Archives Vault

University of British Columbia – Learning Commons Building – Archives Vault

Cendek Railings – Combustible Dust Evaluation

Cendek Railings – Combustible Dust Evaluation

IHA Gateby Intermediate Care Facility – Boiler Condition Assessent

IHA Gateby Intermediate Care Facility – Boiler Condition Assessent

Wellons Canada Corp. – Fire Protection & Building Code Consulting

Wellons Canada Corp. – Fire Protection & Building Code Consulting

Boiler Replacements – Various Facilities *

Boiler Replacements – Various Facilities *

Cargill Track Shed Upgrade *

Cargill Track Shed Upgrade *

Conifex Power – Fire Protection *

Conifex Power – Fire Protection *

Dinoflex Manufacturing *

Dinoflex Manufacturing *

Kootenay Boundary Regional Hospital *

Kootenay Boundary Regional Hospital *

Kootenay Lake Hospital HVAC *

Kootenay Lake Hospital HVAC *

Lakes District Hospital & Health Centre *

Lakes District Hospital & Health Centre *

Lions Gate Wastewater Treatment Plant – Ventilation and Electrical Classification Safety Audit *

Lions Gate Wastewater Treatment Plant – Ventilation and Electrical Classification Safety Audit *

Natural Factors Soft Gelatin Capsule Plumbing & HVAC *

Natural Factors Soft Gelatin Capsule Plumbing & HVAC *

Okanagan Pellet Company – Dust Collection Systems Safety Audit and Safety Classification *

Okanagan Pellet Company – Dust Collection Systems Safety Audit and Safety Classification *

On Site Millwork Dust Collector Fire – Insurance Evaluation *

On Site Millwork Dust Collector Fire – Insurance Evaluation *

Red Leaf Water – Compressed Air Piping *

Red Leaf Water – Compressed Air Piping *

Style Line Manufacturing – Dust Control System *

Style Line Manufacturing – Dust Control System *

Tolko Industries Corporate Office Building *

Tolko Industries Corporate Office Building *

Tsawwassen First Nation Wastewater Treatment Plant *

Tsawwassen First Nation Wastewater Treatment Plant *

University of British Columbia Okanagan Campus Low Temperature District Energy System *

University of British Columbia Okanagan Campus Low Temperature District Energy System *

University of British Columbia Okanagan Campus – Science 3rd Floor Addition and Laboratory Manifold Ventilation Retrofit

University of British Columbia Okanagan Campus – Science 3rd Floor Addition and Laboratory Manifold Ventilation Retrofit

Vernon Water Reclamation Plant *

Vernon Water Reclamation Plant *

Vitalus Nutrition Spray Dryer/Milk Fractionator Safety Assessment *

Vitalus Nutrition Spray Dryer/Milk Fractionator Safety Assessment *

Wood Innovation Design Centre Fire Protection Engineering *

Wood Innovation Design Centre Fire Protection Engineering *