by tagdesignco | Jun 1, 2023
TECK Highland Valley Copper Mine – New Pebble Crusher Dust Control System Evaluation CURA provided a complete in-office engineering and field evaluation of the existing dust control system for this enclosed ore crusher facility consisting of two Metso-Nordberg HP400...
by tagdesignco | Jun 1, 2023
Interfor Grand Forks CURA acted as the Prime Consultant, and as the Mechanical/Site Civil/Fire Protection/Plumbing Consultant, and we provided a fully integrated design team of Mechanical, Architectural, Structural, Geotechnical & Electrical consulting services to...
by tagdesignco | Jun 1, 2023
UBC Science Building – 2020-2022 HVAC Systems Upgrades The Facilities Management group at UBC Okanagan required assistance with determining the root cause and solutions for deficient winter heating system capacity in the 1st and 2nd floors of this existing 100,000ft2...
by tagdesignco | Jun 1, 2023
Shuswap Lake Hospital – Hot Water Heating System Upgrades CURA was retained by the hospital to diagnose the cause of nuisance hot water boiler shutdowns that resulted after the engagement of backup heating systems that occurred once during a period of particularly...
by tagdesignco | Jun 13, 2023
UBC Okanagan Science Building Laboratory Exhaust Heat Recovery During a 2020-2022 major HVAC system upgrade to the Science Building, CURA was contracted by UBC Okanagan to review the building automation system during the post-construction monitoring period, and CURA...