by tagdesignco | Jun 1, 2023
UBC Science Building – 2020-2022 HVAC Systems Upgrades The Facilities Management group at UBC Okanagan required assistance with determining the root cause and solutions for deficient winter heating system capacity in the 1st and 2nd floors of this existing 100,000ft2...
by tagdesignco | Jun 1, 2023
Shuswap Lake Hospital – Hot Water Heating System Upgrades CURA was retained by the hospital to diagnose the cause of nuisance hot water boiler shutdowns that resulted after the engagement of backup heating systems that occurred once during a period of particularly...
by tagdesignco | May 31, 2023
BID Group Spray Building Lease Evaluation CURA performed a building condition assessment for the BID Group and a complete code analysis of this existing heavy-duty maintenance facility, to determine its suitability for conversion to a finishing and paint spray...
by tagdesignco | May 31, 2023
University Hospital of Northern BC – 1 MW Generator Replacement – Owner’s Agent CURA provided Owner’s Agent 3rd party verification of this project that was delivered in a design-build format. Our role included a design check of the HVAC, heat rejection, fuel oil...
by tagdesignco | May 31, 2023
BC Tree Fruits Growers Supply Warehouse Ventilation Assessment CURA provided a complete assessment of ventilation and fire protection requirements for this existing warehouse that is used to store pesticides, herbicides, acids, strong bases, fertilizer and other...