On-Site Millwork Dust Collector Fire – Insurance Evaluation *
Mr. Hutchison was engaged to provide a post-fire evaluation of a commercial millwork facility in Edmonton, Alberta by the facility’s insurer. The facility suffered from a dust collector fire and deflagration that rendered one of their two main dust collection systems inoperable.
The insurer was provided engineering services as follows:
An estimate of the value of the installed dust collection equipment
An estimate of the cost to replace the non-conforming equipment with equipment of like kind and quality (LKQ)
An estimate of the cost to replace the dust collection system with a code-conforming system
The review of the facility’s dust collection equipment was completed in a compressed time frame in order to expedite the claims process to ensure the facility could return to normal operation as quickly as possible.
* Denotes project completed by Mr. Hutchison at another firm
File Number: N/A
Location: Edmonton, AB
Sector: Manufacturing
Services Provided: