TECK Highland Valley Copper A/B Line Dust Control System Evaluation

CURA was contracted by TECK-Highland Valley Copper (TECK-HVC) to provide a modern best-practices evaluation of the existing dust control system for the Coarse Ore Tower #2, Coarse Ore Feed System below Coarse Ore Stockpile #2, and for the A/B Line Coarse Ore feed systems that feed the Highland Mill.

Our analysis included an end-to-end wholistic review of the entire A/B Line feed and ore transfer systems, from the apron feeders to the discharge points inside of the Highland Mill, and our recommendations for system improvements and replacements were detailed in a thorough report that was delivered to TECK-HVC on an emergency basis due to the imminent failure of a major component of the dust control system.

CURA completed an in-office analysis of the existing drawings and details of the dust control system as well as a walk-through of the site, and our recommendations included the addition of our sister company’s specialized conveyor belt cleaning devices that remove 95% of the fugitive particulate from the return belt surface of horizontal belt conveyors.

The overall project goal targeted a 95% reduction of fugitive particulate.

File Number: 1420-0173.00

Location: Logan Lake, BC

Sector:  Industrial, Manufacturing, Mining

Services Provided:

More Projects

TECK Highland Valley Copper Mine – New Pebble Crusher Dust Control System Evaluation

TECK Highland Valley Copper Mine – New Pebble Crusher Dust Control System Evaluation

TECK Highland Valley Copper A/B Line Dust Control System Evaluation

TECK Highland Valley Copper A/B Line Dust Control System Evaluation

Interfor Grand Forks – New Fire Protection System & Fire Pumps

Interfor Grand Forks – New Fire Protection System & Fire Pumps

UBC Science Building – 2020-2022 HVAC Systems Upgrades

UBC Science Building – 2020-2022 HVAC Systems Upgrades

Roxul High-Piled Storage Racking Fire Protection System

Roxul High-Piled Storage Racking Fire Protection System

Shuswap Lake Hospital – Hot Water Heating System Upgrades

Shuswap Lake Hospital – Hot Water Heating System Upgrades

UBC Okanagan Science Building Laboratory Exhaust Heat Recovery

UBC Okanagan Science Building Laboratory Exhaust Heat Recovery

UBC Okanagan Campus Skeena & Commons Buildings District Energy Servicing Study

UBC Okanagan Campus Skeena & Commons Buildings District Energy Servicing Study

Vets Group & FP Innovations Combustible Dust Training Seminars

Vets Group & FP Innovations Combustible Dust Training Seminars

Jim Pattison Outpatient Care & Surgical Centre

Jim Pattison Outpatient Care & Surgical Centre

Campion Marine Combustible Dust Engineering & Gelcoat Spray Booth Consulting

Campion Marine Combustible Dust Engineering & Gelcoat Spray Booth Consulting

UBC Okanagan Science Building Heat Recovery

UBC Okanagan Science Building Heat Recovery

UBC Okanagan 25 Year Campus Master Plan for Medium Temperature District Hot Water Heating

UBC Okanagan 25 Year Campus Master Plan for Medium Temperature District Hot Water Heating

Kind Brewery Steam System

Kind Brewery Steam System

UBC Okanagan MDES District

UBC Okanagan MDES District

UBC Okanagan CHP/MDES/LDES Interconnect

UBC Okanagan CHP/MDES/LDES Interconnect

UBC Okanagan Science Building 3rd Floor & Heat Pump Interconnect

UBC Okanagan Science Building 3rd Floor & Heat Pump Interconnect

TOP40 Woodworks Dust Hazard Audit and Dust System Assessment

TOP40 Woodworks Dust Hazard Audit and Dust System Assessment

Tolko Industries – Lavington Planer – Fire Protection for New Continuous Dry Kiln

Tolko Industries – Lavington Planer – Fire Protection for New Continuous Dry Kiln

Osoyoos Medical Cannabis Grow Facility

Osoyoos Medical Cannabis Grow Facility

Big White Resort – Sewage Treatment Building – Area and Electrical Classification

Big White Resort – Sewage Treatment Building – Area and Electrical Classification

UBC Okanagan Data Centre Cooling

UBC Okanagan Data Centre Cooling

BC Tree Fruits New Cold Warehouse

BC Tree Fruits New Cold Warehouse

BID Group Spray Building Lease Evaluation

BID Group Spray Building Lease Evaluation

University Hospital of Northern BC – 1 MW Generator Replacement – Owner’s Agent

University Hospital of Northern BC – 1 MW Generator Replacement – Owner’s Agent

BC Tree Fruits Growers Supply Warehouse Ventilation Assessment

BC Tree Fruits Growers Supply Warehouse Ventilation Assessment

BC Tree Fruits Oliver Dry Tunnel

BC Tree Fruits Oliver Dry Tunnel

BC Tree Fruits Oliver Ventilation and Cooling Study

BC Tree Fruits Oliver Ventilation and Cooling Study

Tolko Industries Planermill Dust System Optimization

Tolko Industries Planermill Dust System Optimization

Tolko Industries Armstrong Spray Room Ventilation

Tolko Industries Armstrong Spray Room Ventilation

UBC Okanagan Administration Building Fire System Upgrade

UBC Okanagan Administration Building Fire System Upgrade

Bureau Veritas HVAC System Review – Expert Witness

Bureau Veritas HVAC System Review – Expert Witness

Rancho Warehouse & Cooling – Refrigeration Room Ventilation Assessment

Rancho Warehouse & Cooling – Refrigeration Room Ventilation Assessment

City of Prince George New Fire Hall No. 1

City of Prince George New Fire Hall No. 1

Rio Tinto Alcan – Kitimat Operations – Wharf Dust Collection System Replacement – Phase 1

Rio Tinto Alcan – Kitimat Operations – Wharf Dust Collection System Replacement – Phase 1

C&C Wood Products – Dust Hazard Audit and NFPA Audit

C&C Wood Products – Dust Hazard Audit and NFPA Audit

LaFarge Holcim Geocycle Fuel Storage Barn Dust Hazard Audit

LaFarge Holcim Geocycle Fuel Storage Barn Dust Hazard Audit

College of New Caledonia – Welding Instruction Building Fire Protection

College of New Caledonia – Welding Instruction Building Fire Protection

Tolko Industries High Level – Continuous Dry Kiln Fire Protection Engineering Review

Tolko Industries High Level – Continuous Dry Kiln Fire Protection Engineering Review

Kelowna Yacht Club – Marina Docks Fire Protection

Kelowna Yacht Club – Marina Docks Fire Protection

Penticton Regional Hospital – Boiler Rebate Application Support

Penticton Regional Hospital – Boiler Rebate Application Support

Medallion Kitchen Cabinets Dust System Evaluation

Medallion Kitchen Cabinets Dust System Evaluation

Aboriginal Housing Society of Prince George

Aboriginal Housing Society of Prince George

International Forest Products (Interfor) – Adams Lake Division – New Continuous Dry Kiln (CDK) Fire Protection

International Forest Products (Interfor) – Adams Lake Division – New Continuous Dry Kiln (CDK) Fire Protection

Landmark Solutions New Fabrication and Heavy Duty Shop

Landmark Solutions New Fabrication and Heavy Duty Shop

University of British Columbia – Learning Commons Building – Archives Vault

University of British Columbia – Learning Commons Building – Archives Vault

Cendek Railings – Combustible Dust Evaluation

Cendek Railings – Combustible Dust Evaluation

IHA Gateby Intermediate Care Facility – Boiler Condition Assessent

IHA Gateby Intermediate Care Facility – Boiler Condition Assessent

Wellons Canada Corp. – Fire Protection & Building Code Consulting

Wellons Canada Corp. – Fire Protection & Building Code Consulting

Boiler Replacements – Various Facilities *

Boiler Replacements – Various Facilities *

Cargill Track Shed Upgrade *

Cargill Track Shed Upgrade *

Conifex Power – Fire Protection *

Conifex Power – Fire Protection *

Dinoflex Manufacturing *

Dinoflex Manufacturing *

Kootenay Boundary Regional Hospital *

Kootenay Boundary Regional Hospital *

Kootenay Lake Hospital HVAC *

Kootenay Lake Hospital HVAC *

Lakes District Hospital & Health Centre *

Lakes District Hospital & Health Centre *

Lions Gate Wastewater Treatment Plant – Ventilation and Electrical Classification Safety Audit *

Lions Gate Wastewater Treatment Plant – Ventilation and Electrical Classification Safety Audit *

Natural Factors Soft Gelatin Capsule Plumbing & HVAC *

Natural Factors Soft Gelatin Capsule Plumbing & HVAC *

Okanagan Pellet Company – Dust Collection Systems Safety Audit and Safety Classification *

Okanagan Pellet Company – Dust Collection Systems Safety Audit and Safety Classification *

On Site Millwork Dust Collector Fire – Insurance Evaluation *

On Site Millwork Dust Collector Fire – Insurance Evaluation *

Red Leaf Water – Compressed Air Piping *

Red Leaf Water – Compressed Air Piping *

Style Line Manufacturing – Dust Control System *

Style Line Manufacturing – Dust Control System *

Tolko Industries Corporate Office Building *

Tolko Industries Corporate Office Building *

Tsawwassen First Nation Wastewater Treatment Plant *

Tsawwassen First Nation Wastewater Treatment Plant *

University of British Columbia Okanagan Campus Low Temperature District Energy System *

University of British Columbia Okanagan Campus Low Temperature District Energy System *

University of British Columbia Okanagan Campus – Science 3rd Floor Addition and Laboratory Manifold Ventilation Retrofit

University of British Columbia Okanagan Campus – Science 3rd Floor Addition and Laboratory Manifold Ventilation Retrofit

Vernon Water Reclamation Plant *

Vernon Water Reclamation Plant *

Vitalus Nutrition Spray Dryer/Milk Fractionator Safety Assessment *

Vitalus Nutrition Spray Dryer/Milk Fractionator Safety Assessment *

Wood Innovation Design Centre Fire Protection Engineering *

Wood Innovation Design Centre Fire Protection Engineering *