by tagdesignco | Jun 1, 2023
TECK Highland Valley Copper A/B Line Dust Control System Evaluation CURA was contracted by TECK-Highland Valley Copper (TECK-HVC) to provide a modern best-practices evaluation of the existing dust control system for the Coarse Ore Tower #2, Coarse Ore Feed System...
by tagdesignco | Jun 1, 2023
Interfor Grand Forks CURA acted as the Prime Consultant, and as the Mechanical/Site Civil/Fire Protection/Plumbing Consultant, and we provided a fully integrated design team of Mechanical, Architectural, Structural, Geotechnical & Electrical consulting services to...
by tagdesignco | Jun 1, 2023
UBC Science Building – 2020-2022 HVAC Systems Upgrades The Facilities Management group at UBC Okanagan required assistance with determining the root cause and solutions for deficient winter heating system capacity in the 1st and 2nd floors of this existing 100,000ft2...
by tagdesignco | Sep 21, 2017
Kind Brewery Steam System CURA performed Mechanical Engineering steam system design for this microbrewery in West Kelowna. Steam capacities from the boiler to individual pieces of brewing equipment were sized and calculated to ensure that the master brewer could...
by tagdesignco | May 31, 2023
Medical Cannabis Grow Facility CURA provided preliminary design services to the Owner’s group and project Architects for this two-story 90,000ft2 medicinal cannabis grow facility, as well as conducted an analysis of cooling and dehumidification loads for the bare root...